NH.Gov
|
| Bureau
of Public Works, Design and Construction |
|
 |
BPW
HOME PAGE
Bidding: Bid
Invitations Bid
Results BPW Project Status
Info
Consultant
Work: Requests for Interest and Qualifications
Consultant
Selection Information Consultant
Projects
Miscellaneous: Public
Works Documents Labor Compliance
Links FAQ
Contact
Information
Consultant Selection - Public Works
Current Requests for Interest and Qualifications
Below is a list of projects for which the
Consultant Selection Committee is seeking Qualifications-based contracts. Those Consultant Firms interested in being considered for selection must submit
five copies of a Letter of Interest
and Qualifications (LOIQ) prior to the indicated deadline.
LOIQ's should include a 1 page statement of interest stating the
project(s) for which the Consultant would provide services and an
additional one-to-three page statement of qualifications including
applicable experience. LOIQ's shall not exceed a total
of four pages. Pages shall be 81/2" x 11"
and numbered. Please do not attach brochures to LOIQ. Consultant firms must submit a separate
LOIQ for each project in which they are interested. Mail LOIQ to: Mark T
Nogueira, Administrator, Bureau of Public Works, Design
and Construction, PO Box 483, John O Morton Building, 7
Hazen Drive, Room 250, Concord, NH 03302-0483.
If
you would like to have your company notified directly by email of
future projects, please send your company's email address
and contact information to the following: bthomas@dot.state.nh.us
 |
A |
Architectural |
FPE |
Fire Protection Engineering |
CE |
Civil Engineering |
G |
Geotechnical Exploration and/or Engineering |
CM |
Construction Management |
ME |
Mechanical Engineering |
E |
Environmental |
S |
Survey |
EE |
Electrical Engineering |
SE |
Structural Engineering |
| Project: |
Facilities
Analysis and Sustainment Plan |
| Posting
Date: |
April
10, 2012 |
| Scope
of Work: |
The New Hampshire Dept of
Administrative Services plans to retain
architectural and engineering services to
develop a statewide detailed facility analysis
for the New Hampshire Adjutant General
Department to identify the following:
condition of facilities; short and long term
maintenance items with associated schedules;
comprehensive energy review/audits at each
facility; complete code analysis of each
facility; and recommendations and associated
costs for upgrades, priorities, and cost of
"not doing the work"; life cycle cost
analysis of all work; staffing levels and
organizational structures required to maintain
current facilities.
The immediate funding
available for this project is $375,000.00.
There is a possibility of an additional
$200,000.00 in funding which may become
available in the near future.
|
|
Services
Required:
|
A |
|
Response Due:
|
April
23, 2012 |
|
Available Funding:
|
$375,000.00-$575,000.00 |
|
|
Do you have a question or comment regarding this information or the
Consultant selection process? Contact Public Works at 603-271-3516.
Contact Us.
Top
of Page
|